[Home] [Technical]

UP

Technical | Engine-housesBasement

Section to be developed

DSC01623 -s

Access stairs down to the South engine-house drum pit

DSC01624 -s

Location of the original doorway in the end-wall of the South engine-house drum pit. This was closed off when an external boiler flue-way was installed across the end-wall a few years after the engine-house was rebuilt. The brickwork is actually the side wall of the flue-way

DSC01625 -s

Access stairs to South winder 1922 Burn’s brake fulcrum platforms. The original stairs to these were located at the ends of each platform near to the engine-house end wall but were built-up in the 1950s to provide foundations for a suspended-caliper brake.

TOP


Copyright © 2005 - 2020   J.S. Thatcher

Page updated on:

11 Nov, 2023

at

05:24:42 PM

In case of problems contact:

BuiltWithNOF